Double Sided Escape Route Signs
The British Standard for Escape Route Signing, BS5499-4:2000 recommends that for an escape route signing system to be effective, it is important that from any place within the building occupants should have sight of a sign, or series of signs, which leads them to a place of safety.

There are areas within a means of escape route that can prevent a person from fixing an escape route sign either on the wall or above a door. Examples of these are factory environments (as illustrated), floor to ceiling doors, and corridors which lead into open areas, indicating a change of direction.


These Photoluminescent Rigid PVC double sided escape route signs incorporate the internationally recognised graphical symbol for escape routes, and are an effective alternative to traditional emergency lighting systems.


405DS T (120 x 340mm)
405DS K (150 x 400mm)
405DS J (200 x 450mm)


448DS T (120 x 340mm)
448DS K (150 x 400mm)
448DS J (200 x 450mm)

449DS T (120 x 340mm)
449DS K (150 x 400mm)
449DS J (200 x 450mm)

430DS T (120 x 340mm)
430DS K (150 x 400mm)
430DS J (200 x 450mm)

438DS T (120 x 340mm)
438DS K (150 x 400mm)
438DS J (200 x 450mm)

439DS T (120 x 340mm)
439DS K (150 x 400mm)
439DS J (200 x 450mm)
m
How to order a double sided hanging sign
  1. Quote the unique product size code of your choice, ie: 405DS T
  2. Enter the quantity of signs that you require, ie: 405DS T x 10
  3. Add '(R)' for Photoluminescent Rigid PVC, ie: 405DS T x 10 (R)
Hanging Kit

This hanging kit consists of two spring double hooks and two styles of fixings, for flat or suspended ceilings.

The spring double hooks enable you to 'stretch' the escape route sign to a viewing height that can easily be seen by occupants travelling within the means of escape route.

Product code: Zhooks/clips

n

How to order a hanging kit

  1. Quote the unique product code, ie: Zhooks/clips
  2. Enter the quantity of kits that you require, ie: Zhooks/clips x 10
How to use the Hanging Kit
  1. Mark ceilings where the fixings are to be placed (as illustrated)
  2. Hold sign up to ceiling and duplicate the marks from the ceiling on to the sign - this is to ensure that the holes drilled into the sign correspond to where the ceiling fixings will be mounted.

Note: We recommend that the holes are drilled equal distance in from each end of the sign.

  1. Take the fixing appropriate for the type of ceiling you are working with, as indicated above, and position in place.
  1. Take rods and insert one end of each into the drilled holes on the sign.

 

  1. Take sign with inserted rods and 'hook' onto the fixing.
Note: You can also use this hanging kit for single sided hanging signs.

< HOME